
Materials
Q235B20# Carbon SteelASTM A105
Reference Standards
ASME B16.5ASME B16.47EN 1092GB/T 9124
Industries
Water ProjectsPower PlantsChemical Plants
Applications
Flanged ConnectionsEquipment InterfacesValve Assemblies
Installation position: At both sides of valves, equipment interfaces, pipeline maintenance sections, road crossings and structure inlets or outlets.
Purpose: Provides a detachable rigid connection between pipes, valves and equipment.
Problem solved: Supports maintenance, valve replacement and sectional dismantling, while enabling rapid connection where welding is impractical.