Thermal Power Plant Overhaul Supply

Challenge
The maintenance schedule was fixed, requiring early confirmation of standards, pressure classes and delivery dates.
Package Solution
Materials and standards were matched by system list, with stock, fabrication and logistics coordinated in advance.
Service Value
Delivery timing became clearer and reduced urgent replenishment during the overhaul period.