Ganquanbao New Water Source Project - Phase II Water Plant

Project Overview
The Ganquanbao New Water Source Project - Phase II Water Plant is a major municipal water supply project in Urumqi, Xinjiang. Located near the northwest area of the “500” Reservoir at approximately 468 m above sea level, it uses reservoir raw water and serves Ganquanbao New District, Midong District, the Airport Area, Kaziwan District and reserved development areas. Total designed capacity is 600,000 m³/day.
Project Highlights
The three-phase project covers raw water intake and transmission, water plant construction, clean water transmission, booster stations and urban mains. DN500-DN2200 pipelines total approximately 228 km. Phase I includes the 400,000 m³/day Ganquanbao Industrial Park Phase II Water Plant and approximately 155.7 km of pipelines; Phase II includes emergency water supply and approximately 67.6 km of DN700-DN1400 pipelines; Phase III adds 200,000 m³/day and supporting DN1200 pipelines.
KAIYI's Contribution
KAIYI joined the supply process in 2021 through project communication and technical cooperation. Drawing on project experience, professional service and reliable quality, KAIYI continuously supplied pipeline products and accessories, supported by strict quality control, efficient production management and timely delivery.
Products Supplied
- Large Diameter Steel Pipes
- Special-Shaped Steel Pipes
- Pipe Fittings
- Expansion Joints
- Reducers
- Pipeline Accessories
Our Commitment
KAIYI always adheres to the philosophy of “Scientific Management, Honest Operation, Quality Assurance.” With reliable products, professional technical support and comprehensive pipeline solutions, KAIYI supports water supply, municipal infrastructure and engineering projects worldwide.
Products Used
Project Gallery



