Thermal Power Plant Overhaul Supply

التحدي
The maintenance schedule was fixed, requiring early confirmation of standards, pressure classes and delivery dates.
حل الحزمة
Materials and standards were matched by system list, with stock, fabrication and logistics coordinated in advance.
قيمة الخدمة
Delivery timing became clearer and reduced urgent replenishment during the overhaul period.